Proposed Residential Development on Lot 1613 at Kap Pin Long

Client

Projexasia Limited

Main Contractor

Projexasia Limited

Work Location

Sai Kung, New Territories

Duration

15 July 2015 – 2 Sept 2015

Our Position

Lump Sum Subcontractor

Our Duties

Demolition jobs as per the drawings with high accuracy and low margin of errors